All blogs

Audience hands up during the final discussion on the future for CO2 capture from cement.
Figure 5. Top-view layout (left) of borehole CS-D6: dashed area are grouted A string of geophones (right) spread out on the tunnel floor, waiting to be placed in the inner part of the casing (in blue). (Photo: A. Zappone)
Final design of the INACHUS robot.
Attentive listeners on tour in Lyses new hydro power plant, Lysebotn II.
Silicium, thin solar cell
OPWIND
Photo: Jan Håvard Skjetne
Waste symposium1
LNG carriers may load/unload in vulnerable locations
Lng RPT Sketch of LNG spill scenario during ship/land transfer. 
1 32 33 34 51