Market4RES to its finishing point

author
Andrei Z Morch
Researcher
Published: 27. Oct 2016 | Last edited: 16. Apr 2025
2 min. reading
Comments (0)

After two and a half challenging years, the Market4RES “Post 2020 framework in a liberalised electricity market with large share of Renewable Energy Sources (RES)” project, coordinated by SINTEF Energy Research, has finally arrived to its finishing point. The project Consortium is happy to be able to share its results and conclusions.

Setting the 2020 climate and energy targets in 2007 was an important milestone. This indicating a paradigm shift for the European power industry, which used to be one of the most conservative sectors.

Massive efforts were made to promote an accelerated integration of Renewable Energy Sources (RES) in Europe.

Need to modify the existing European electricity market design

The market interventions on this scale have however led to some adverse effects of the financial subsidies and significant penetration of electricity from renewable energy sources (RES-E). This highlights the need to modify the existing European electricity market design. This in order to guarantee sustainable framework conditions in the long-term, both for the market-compatible integration of further RES-E technologies and for the maintenance of adequate levels of firm electricity generation capacity.

The objective of the project Market4RES was to investigate, provide recommendations and contribute to the debate on the potential evolution of the EU Target Model. And enabling the integration of renewable electricity in the market by supporting the implementation of the 2020 targets and their follow-up towards reaching the decarbonization goals of 2050. The project was co-funded by Intelligent Energy Europe (IEE) programme.

Panel debate from the Final Event in Brussels 2016-10-20
Panel debate from the Final Event in Brussels 2016-10-20

The project results were presented at open Final Event, organised in Brussels 2016-10-20, where the main outcomes of the project were presented to more than 50 participants from the European Power Industry. The event included a panel debate with high-level participants from WindEurope (Belgium), Comillas Pontifical University (Spain), ENTSO-E (Belgium), EURELECTRIC (Belgium), DG Energy (European Commission), and ERG SpA (Italy).

Market4RES Final Report “Recommendations to policy makers on electricity market design options” can be downloaded.

eu-flagg_h100

The project is Co-funded by the Intelligent Energy Europe Programme of the European Union.

Comments

No comments yet. Be the first to comment!

Leave a comment Cancel reply

Your email address will not be published. Required fields are marked *

More about Energy

nettstasjon i strømnettet og vindturbiner i bakgrunnen

Can the power system become SF₆-free by 2050?

Author Image
Author Image
Author Image
3 forfattere
strømnett vinterstid, foto

What is the status of phasing out SF6 gas in switchgear and circuit breakers?

Nina Sasaki Støa-Aanensen
Nina Sasaki Støa-Aanensen
Senior Research Scientist
Strømnett og en by i bakgurnnen

How do we plan and operate for security of electricity supply?

Susanne Sandell
Susanne Sandell
Researcher

Technology for a better society

  • About this blog
  • How to write a science blog
  • Sign up for our newsletter
  • News from NTNU and SINTEF
  • Facebook
Gå til SINTEF.no
SINTEF logo
© 2025 SINTEF Foundation
Privacy Editorial Press contacts Website by Headspin